Availability: | |
---|---|
Bene-Farm
Process principle: using clean energy, electric heating, high-efficiency conversion, organic carrier as the heat transfer medium, heating Evenly, the three wastes are discharged, and the standard is fully treated and does not cause secondary pollution to the environment.
Drying process, solid product The product is directly used as an organic fertilizer raw material, and it can also be directly buried in the forest fruit and garden. To Materials (sick and dead livestock and poultry) are directly put into the equipment cavity without external crushing, no blood discharge or splashing.
The jacket layer is heated by electric heating to make the medium heat up to 185°C-----200°C to sterilize and mature the contact materials. The material layer bears a pressure of 0.1mpa, and is fully matured and sterilized.
To work process : Feeding → heating and curing → high temperature sterilization → pressure relief drying → cooling and discharging → organic fertilizer To Working time: feeding → finished product storage, total time is 4-5 hours.
Capacity | Size | Driving power | Heat power |
300kg/batch | Φ800*1400 | 4kw | 40kw |
500kg/batch | Φ900*1500 | 5.5kw | 60kw |
1000kg/batch | Φ1000*2000 | 7.5kw | 80kw |
Process principle: using clean energy, electric heating, high-efficiency conversion, organic carrier as the heat transfer medium, heating Evenly, the three wastes are discharged, and the standard is fully treated and does not cause secondary pollution to the environment.
Drying process, solid product The product is directly used as an organic fertilizer raw material, and it can also be directly buried in the forest fruit and garden. To Materials (sick and dead livestock and poultry) are directly put into the equipment cavity without external crushing, no blood discharge or splashing.
The jacket layer is heated by electric heating to make the medium heat up to 185°C-----200°C to sterilize and mature the contact materials. The material layer bears a pressure of 0.1mpa, and is fully matured and sterilized.
To work process : Feeding → heating and curing → high temperature sterilization → pressure relief drying → cooling and discharging → organic fertilizer To Working time: feeding → finished product storage, total time is 4-5 hours.
Capacity | Size | Driving power | Heat power |
300kg/batch | Φ800*1400 | 4kw | 40kw |
500kg/batch | Φ900*1500 | 5.5kw | 60kw |
1000kg/batch | Φ1000*2000 | 7.5kw | 80kw |